北京赛车PK10计划

Transmission Line

Home / 北京赛车PK10计划Project Elements / Transmission Line


Transmission Line and Substations

 

In order to supply electricity to the Thai and Lao grids, a transmission line of approximately 183 kilometers has to be constructed。 To supply electricity to the Thai grid, a 67-km, 500-kV double circuit overhead transmission line will be built from the Power Plant to the Thai-Lao Border。 To supply electricity to the Lao grid, an approximately 115–km, 115-kV double circuit overhead transmission line will be built from the Power Plant to a substation near Hongsa town, and then to the Luang Prabang 2 substation。 Apart from the 500-kV and the 115-kV double circuit overhead transmission lines, the Hongsa Town and the Luang Prabang 2 substations  will also have to be constructed。

 

 


福建快3 欢乐生肖官方网站 河北快3 极速快三 股票配资 江苏快3 贵州快3 上海快3 快赢彩票计划 福建快3